My Account Checkout Blog Login

Shopping Cart

0 Items
$0.00
Menu

4 WIRE, US26D 4.5X4.5 LONG LEADS ONE SIDE

$104.00
MSRP: $104.00
Minimum Quantity: 1
Qty Price (per unit)
1 - 19 $104.00
19 - 99 $98.80
99+ $93.86
Qty in Stock: 160
Qty:

 

Eligible for FREE Shipping
Additional Info:
4 WIRE LONG LEADS ONE SIDE

We listened to you and we made changes

 

For a while now, our customers have been saying they want a long lead, four wire hinge in the most popular finish (US26D). We decided that you deserve this lower cost, reliable hinge that is easier to work with and requires less connections. 

Because we are using less  of our expensive TEFLON, MIL-SPEC wires (no heavy 20awg wires as our 2+4 model has) and since we only have to drill one hole for wires instead of two, we can offer these at a better price point. 

We're sure you will agree that this hinge can be used for most simple electric lock installations, where you only need a power wire for small motors or solenoids, with maybe a REX. 

 

Only available in the 4.5 x 4.5 US26D Standard Weight. Special Orders Welcome